IBM C1000-132 exam consists of 63 multiple choice questions, and candidates have 105 minutes to complete the exam. The questions cover a wide range of topics, including Maximo architecture, installation and deployment, configuration, security, reporting, and integration. C1000-132 exam is conducted online and can be taken at any time from anywhere in the world. The IBM C1000-132 exam is an excellent way for Maximo professionals to showcase their expertise and advance their careers in the field of asset management.


IBM C1000-132 exam covers a range of topics related to IBM Maximo Asset Management solutions, including installation and configuration of IBM Maximo Asset Management, database configuration, system administration, security, and performance tuning. C1000-132 exam is designed to test the candidate's ability to configure and customize IBM Maximo Asset Management solutions to meet the specific needs of an organization.

 

NEW QUESTION # 43
When a Service Level Agreement is applied to a WORKORDER object, what Commitment Type will be missing from the lookup?

  • A. DOWNTIME
  • B. DELIVERY
  • C. AVAILABILITY
  • D. CONTACT

Answer: B

Explanation:
When a Service Level Agreement (SLA) is applied to a WORKORDER object in IBM Maximo Manage v8.0 implementation, the Commitment Type that will be missing from the lookup is DELIVERY. The other possible Commitment Types in Maximo Manage are DOWNTIME, AVAILABILITY, and CONTACT.


NEW QUESTION # 44
In the Preventive Maintenance (PM) application, how is the Estimated Next Due Date calculated when Adjust Next Due Date is selected?

  • A. Extended Date -Alert Lead (Days)
  • B. Extended Date + Frequency
  • C. Extended Date + Target Start Time
  • D. Extended Date + Alert Lead (Days)

Answer: B


NEW QUESTION # 45
Where can Default Values be specified for Service Requests created using the Service Request Work Center?

  • A. Application Designer
  • B. Service Desk Application
  • C. in the users Profile
  • D. Administration Work Center

Answer: D


NEW QUESTION # 46
What is a core application in Maximo Manage?

  • A. Customer Billing
  • B. Graphical Scheduling
  • C. Maintenance Version Control
  • D. Permit to Work

Answer: D

Explanation:
The Permit to Work application is a core application in IBM Maximo Manage v8.0. This application allows users to manage work permits, ensure compliance with safety regulations, and ensure that work is authorized before it is started. Other core applications in Maximo Manage include Work Order Tracking, Asset Management, and Inventory Management.


NEW QUESTION # 47
How can a Master Preventive Maintenance record be associated with multiple non-rotating assets?

  • A. Use the Apply Down Hierarchy action on the Master Preventive Maintenance record.
  • B. Add the Assets to the Multiple Assets table on the Master Preventive Maintenance record.
  • C. Use an Asset Template.
  • D. Use the Move/Modify Assets action.

Answer: C

Explanation:
To associate a Master Preventive Maintenance record with multiple non-rotating assets, we can add the assets to the Multiple Assets table on the Master Preventive Maintenance record. This allows us to associate the preventive maintenance schedule with multiple assets, ensuring that the maintenance activities are performed on each of the associated assets as scheduled.


NEW QUESTION # 48
In the Purchase Requisitions application and with default settings, what status does the Purchase Requisition change to when all of its lines have been copied to a Purchase Order or a Contract?

  • A. CLOSE
  • B. COMPLETE
  • C. APPR
  • D. INPRG

Answer: B

Explanation:
In the Purchase Requisitions application with default settings in IBM Maximo Manage, when all lines of a Purchase Requisition have been copied to a Purchase Order or a Contract, the status of the Purchase Requisition changes to COMPLETE.


NEW QUESTION # 49
When adding an Asset to a Work Order, both the Asset and its Location record have a Failure Class defined.
Which Failure Class will be used on the Work Order?

  • A. Location
  • B. It will be left empty.
  • C. It will use the record with the highest priority.
  • D. Asset

Answer: D


NEW QUESTION # 50
In which Maximo add-on can the Build Data Interpreter (BDI) be found?

  • A. Maximo Buildinq Information Modelinq
  • B. Maximo Infrastructure and Buildinq Modeler
  • C. Maximo Health, Safety and Environment
  • D. Maximo Asset Confiquration Manaqer (ACM)

Answer: D


NEW QUESTION # 51
What information can be updated in the Master PM application for an associated Preventive Maintenance record (PM)?

  • A. PM Hierarchy
  • B. Generate Work Orders
  • C. PM Forecast
  • D. Work Order Status

Answer: A

Explanation:
In IBM Maximo Manage v8.0, the Master PM application is used to manage and control multiple Preventive Maintenance (PM) records through a central template known as the Master PM. The primary purpose of the Master PM application is to provide a standardized structure for PMs and streamline the maintenance process by enabling centralized updates to associated PM records.
The key updates that can be made to associated PMs through the Master PM application include:
* Frequency and Scheduling Information - The Master PM can dictate the time- or meter-based frequency at which work orders are generated, and apply this to all associated PMs (or selectively if desired)
* Job Plans and Sequence - Users can specify job plans on a sequential basis, which helps in scheduling varied levels of maintenance activities. Changes to the job plan sequence in the Master PM can be propagated to all associated PMs
* Seasonal Dates - Active dates or seasonal adjustments to maintenance activities can be set up within the Master PM, and these adjustments can be transferred to associated PMs as necessary
* PM Hierarchy - The Master PM application allows users to configure and manage PM hierarchies, which helps in establishing parent-child relationships among PM records. This hierarchical structure is especially useful in organizing maintenance tasks for complex assets with interrelated components, ensuring that all relevant maintenance tasks are triggered appropriately Thus, option D (PM Hierarchy) correctly represents the feature that can be updated in the Master PM application for associated PM records.


NEW QUESTION # 52
Which Maximo application can be used to generate replacement plans for assets?

  • A. Maximo Predict
  • B. Maximo Manage
  • C. Maximo Health
  • D. Maximo Health, Safety and Environmental (HSE)

Answer: C

Explanation:
IBM Maximo Health, part of the Maximo Application Suite, is specifically designed to enable comprehensive asset performance monitoring, including the capability to generate replacement plans for assets. With Maximo Health, users can assess an asset's remaining useful life, criticality, and health scores to make data-driven decisions about whether to repair, refurbish, or replace an asset.
Key features in Maximo Health that facilitate replacement planning include:
* Expected Life and Replacement Planning: Users can evaluate assets approaching the end of their lifecycle. For assets flagged for replacement or nearing their projected end of life, Maximo Health offers views like the "Expected Life" or "Plan Costs" to initiate a replacement plan. This process allows for strategic planning of asset replacements to ensure operational reliability and cost-effectiveness IBM GitHub Maximo Health integrates data from asset condition monitoring, usage history, and criticality analysis, allowing for a proactive approach to asset management and enabling organizations to optimize maintenance budgets by planning replacements only when necessary. Thus, option B (Maximo Health) is the correct answer.


NEW QUESTION # 53
What are three integration End Points Handlers available in Maximo Manage?

  • A. XMLFILE
  • B. EMAIL
  • C. XLS
  • D. WSDL
  • E. FLATFILE
  • F. KAFKA

Answer: A,B,E

Explanation:
Three integration End Points Handlers available in Maximo Manage are XMLFILE, EMAIL and FLATFILE.


NEW QUESTION # 54
When creating a labor record, what must be associated with it?

  • A. Person Record
  • B. Crew
  • C. Supervisor
  • D. User Record

Answer: A

Explanation:
When you create a labor record in IBM Maximo Manage v8.0, you enable a person to report time against a work request1. Before you create a labor record, you must create a corresponding person record1. A person record is defined at the System level and when a person works across multiple organizations, they need multiple Labor records linked to the same Person record2.


NEW QUESTION # 55
What is the default status in the Quick Reporting Application?

  • A. ENTERED
  • B. DRAFT
  • C. INPRG
  • D. APPR

Answer: C

Explanation:
The default status in the Quick Reporting Application in IBM Maximo Manage is DRAFT.


NEW QUESTION # 56
When viewing a Storeroom in the Manage Inventory Work Center, what are three record sets (tabs) that can be viewed?

  • A. Year to Date Figures
  • B. Child Storerooms
  • C. Balances
  • D. Reconcile
  • E. Vendors
  • F. Counts

Answer: C,D,E,F

Explanation:
In IBM Maximo Manage v8.0 implementation, when viewing a Storeroom in the Manage Inventory Work Center, the three record sets (tabs) that can be viewed are Child Storerooms, Counts, and Balances. These record sets provide different views of the inventory and allow users to manage and track inventory levels and movements.


NEW QUESTION # 57
In the Meters application what are the three meter types?

  • A. CHARACTERISTIC
  • B. FEATURES
  • C. CONTINUOUS
  • D. CONSTANT
  • E. GAUGE
  • F. CALIBRATION

Answer: A,C,E

Explanation:
In the Meters application, the three meter types are GAUGE, CHARACTERISTIC, and CONTINUOUS. GAUGE meters measure a discrete value or range of values, such as the oil pressure in an engine. CHARACTERISTIC meters measure a specific attribute of an asset, such as the temperature of an engine. CONTINUOUS meters track usage or consumption over time, such as the number of hours an asset has been in operation.


NEW QUESTION # 58
What combination of information on a Work Order is used to create a histogram in the Graphical Scheduling application?

  • A. Craft/Skill Level Quantity and Hours
  • B. Craft Quantity and Hours
  • C. Crew Work Group Quantity and Hours
  • D. Labor and Crew Hours

Answer: D

Explanation:
In the Graphical Scheduling application, a histogram can be created based on the combination of Labor and Crew Hours. This histogram provides a visual representation of the distribution of labor and crew hours across different work orders and helps in identifying areas where the workload is high or low.


NEW QUESTION # 59
What is the result of selecting the Validate GL Component Combinations in the Chart of Accounts application on financial transactions?

  • A. Any GL component can be used.
  • B. Only valid GL accounts can be used.
  • C. Any valid GL component can be used.
  • D. Validates transactions occurred during an active financial period.

Answer: B

Explanation:
When selecting the Validate GL Component Combinations in the Chart of Accounts application on financial transactions in IBM Maximo Manage, only valid GL accounts can be used.


NEW QUESTION # 60
In the Assets application a used engine needs to be replaced with a rebuilt engine, how might the rebuilt engine inherit the depreciation schedule from the used engine?

  • A. Use the action Split Depreciation Schedules.
  • B. Use the action Exchange Depreciation Schedules.
  • C. Use the action Copy Depreciation Schedules.
  • D. Use the action Swap Depreciation Schedules.

Answer: C

Explanation:
To replace a used engine with a rebuilt engine in the Assets application in IBM Maximo Manage v8.0 implementation and inherit the depreciation schedule from the used engine, you can use the "Copy Depreciation Schedules" action. This action allows you to copy the depreciation schedules from the old asset to the new asset, including the depreciation terms and any calculation information.


NEW QUESTION # 61
The loT Connector provides Maximo Manage, Maximo Health and Maximo Predict the ability to connect to which two data sources?

  • A. Maximo Monitor
  • B. Maximo Safety
  • C. Maximo Assist
  • D. IBM Watson loT Platform
  • E. Maximo Spatial

Answer: A,D

Explanation:
IoT Connector provides Maximo Manage, Maximo Health and Maximo Predict the ability to connect to C. IBM Watson IoT Platform and E. Maximo Monitor data sources. The IoT Connector in the Administration Work Center can be used to configure a connection to an IoT platform such as IBM Watson IoT Platform and IBM Maximo Asset Monitor1.


NEW QUESTION # 62
In the Work Order Tracking application, a Work Order is generated from a Preventive Maintenance (PM) record. How is the target finish date calculated?

  • A. the Work Order target start date + the Job Plan duration
  • B. the Job Plan start date + the Job Plan duration
  • C. the Job Plan finish date
  • D. the PM target finish date

Answer: A

Explanation:
In the Work Order Tracking application, when a Work Order is generated from a Preventive Maintenance (PM) record, the target finish date is calculated as the Work Order target start date + the Job Plan duration.


NEW QUESTION # 63
What is the result of selecting the Validate GL Component Combinations in the Chart of Accounts application on financial transactions?

  • A. Any GL component can be used.
  • B. Only valid GL accounts can be used.
  • C. Any valid GL component can be used.
  • D. Validates transactions occurred during an active financial period.

Answer: B

Explanation:
When selecting the Validate GL Component Combinations in the Chart of Accounts application on financial transactions in IBM Maximo Manage, only valid GL accounts can be used.


NEW QUESTION # 64
A user wishes to perform the same work tasks on several assets simultaneously. How can this be configured?

  • A. A Master Job Plan should be created with Tasks for each Asset.
  • B. A Work Order Hierarchy should be created against the same Job Plan used for all stops.
  • C. A Route should be created with each stop being one Asset and the Job Plan associated with the Route record.
  • D. The Assets should be specified on the Multiple Assets, Locations and CIs table on the Work Order.

Answer: C

Explanation:
To perform the same work tasks on several assets simultaneously, a route can be created in the Routes application. A route is a series of work orders that are generated in a specific sequence to maintain a group of assets. Each stop in the route can be associated with a specific asset, and the job plan can be assigned to the route record, which means the same job plan tasks can be performed on each asset.


NEW QUESTION # 65
In which two places can Service Request Categories be created for use in the Service Request Work Center?

  • A. Service Desk Application
  • B. Classifications Application
  • C. Business Analysis Work Cen
  • D. Service Catalog Application
  • E. Administration Work Center

Answer: B,E

Explanation:
https://www.ibm.com/support/pages/creating-service-request-categories-and-category-options-service-request- work-center#:~:text=In%20the%20Service%20Request%20Work%20Center%2C%20an%20administrator, Object%20parameter%20and%20Asset%20parameter%20set%20to%20SR.
In IBM Maximo Manage v8.0, Service Request Categories for the Service Request Work Center can be created in the Administration Work Center and through the Classifications Application:
* Administration Work Center: The Service Request Configuration section within the Administration Work Center enables administrators to set up and customize service request categories specifically for use in the Service Request Work Center. This involves defining properties, categories, and issues users select when creating service requests
* Classifications Application: Categories are also managed by setting up classifications associated with service requests in the Classifications application. When a classification is created with associations to the "Asset" and "SR" (Service Request) objects, it becomes available as a category option in the Service Request tool. This approach allows issues to be assigned to specific categories using ticket templates tied to classifications These configurations provide a structured way to set up service categories that enhance service request management by ensuring users select relevant, predefined options during request creation.


NEW QUESTION # 66
If additional attributes are added to the Work View, how can they be automatically updated from changes made to a corresponding Ticket and Work Order fields?

  • A. by modifying the existing Object Launch Point automation script UpdateWV
  • B. by updating the existing Cron Task UpdateWorkView that has two instances TKT2WV and W02WV that use the Crossover Domains of the same name
  • C. by adding a Crossover Domain to TICKETID or WONUM
  • D. by modifying the existing Crossover Domains TKT2WV or W02WV

Answer: D

Explanation:
In IBM Maximo Manage v8.0 implementation, if you add additional attributes to the Work View and want them to be automatically updated from changes made to corresponding Ticket and Work Order fields, you can modify the existing Crossover Domains TKT2WV or W02WV. Crossover Domains define a mapping between fields on two different objects, allowing data to be synchronized between them.


NEW QUESTION # 67
When working with Purchase Requests, which statement is correct?

  • A. Purchase Request Description is mandatory in the header section.
  • B. One Purchase Request can contain both Item and Material type lines
  • C. All Purchase Requests must be approved by an authorized person.
  • D. Purchase Request must have a vendor specified.

Answer: B

Explanation:
When working with Purchase Requests in IBM Maximo Manage, one Purchase Request can contain both Item and Material type lines.


NEW QUESTION # 68
......


To successfully pass the IBM C1000-132 exam, candidates must demonstrate their knowledge of various topics related to IBM Maximo Manage v8.0, including its architecture, security features, installation and configuration, database management, customization, and integration with other systems. IBM Maximo Manage v8.0 Implementation certification exam is ideal for IT professionals, system administrators, and consultants who are looking to validate their skills and knowledge in implementing IBM Maximo Manage v8.0 solutions in a professional setting.

 